A January 2009 draft prepared the Pentagon to respond to a proposal to study foreign aerial threats over the next 40 years, should Senator Harry Reid raise it. The document describes a contract awarded to one company and deadlines for reports, but does not say whether the subject came up at the meeting.
An internal Defense Intelligence Agency (DIA) document says the talking points were prepared in case Senator Harry Reid raised the subject.
The draft, dated January 2, 2009, was prepared for the agency’s director, Lieutenant General Maples, ahead of a meeting with Reid. It describes a program called AAWSAP, short for Advanced Aerospace Weapon System Applications, which operated at the agency from 2008 to 2012. According to the document, Reid and Senator Daniel Inouye requested a study of foreign aerial threats over the next 40 years in a July 2008 supplemental budget. Reid, the document says, was keenly interested in technologies radically different from those used in today’s most advanced aircraft.
One Contract, One Proposal
The request for proposals was issued on August 18, 2008. Only one proposal came in, from a company called Bigelow Aerospace Advanced Space Studies. The proposal was deemed to meet the requirements, and the contract was signed on September 22. The program was divided into 12 technology research areas, each with its own management plan. The plans were rated from good to excellent.
Reports Due by July 2009
The company was expected to deliver two detailed reports to the agency for each area, with all of them due by the end of July 2009. The Defense Security Service completed its inspection of the facility on December 17, 2008, and the facility’s security clearance was expected soon. The work was described as progressing on schedule and within budget.
The document does not say what the reports would contain or whether Reid raised the subject at the meeting. But the official summary attached to the document presents a different picture. It adds that the agency judged the program to have produced reports of limited value and recommended transferring it to another agency. That sentence does not appear in the body of the document received.